Having done the weekly shop I picked up some more edge trim, I would like to get this from the timber yard but their mouldings are very dirty and dusty so I got it from Wickes. Before finishing the toilet window I spent what remained of the morning and the early part of the afternoon framing out the reveal of the nearside window ready to line the wall tomorrow.

Before packing up for the day I had completed the window reveal, finished the toilet window trim and lined the lower part of the toilet wall with the twin wall PVC cladding. I just now have to work how to treat the upper part of the toilet rear wall where the top of the door frame and  cable trunking are exposed, and the side wall of the van where the cable trunking is again exposed and the toilet will be complete.