Skip to content
Ursus Volans

Ursus Volans

Ursus Volans
  • Home
  • Kiting
  • Photography
  • Blog
  • Contact
  • Instagram Feed
  • instagram
  • facebook
  • linkedin
  • instagram
  • facebook
  • linkedin

Month: April 2010

Ursus Volans > Blog > 2010 > April

Day 54: Holes and Primer

Having slept on it, I decided to move what holes I could on the gas tank mounting frame, and to open out those where only…

View More Day 54: Holes and Primer

Day 53: S*d’s Law and Templates

I was up early this morning, I have no idea why, but with the days  much longer now I spent an hour or so before…

View More Day 53: S*d’s Law and Templates

Day 52: A Big Red Tank

I was up before the Lark today and in to work by 4:40am to carry out an ERP system upgrade, unusually the upgrade went with…

View More Day 52: A Big Red Tank

Day 51:Orders and Quotation Requests

This morning I  emailed the tank drawing along with a request for a quote to a company with an e-bay shop who also get a…

View More Day 51:Orders and Quotation Requests

Day 50: Measuring up

With the insulation almost done, and just two sections to be fitted to the ceiling my thoughts have now turned to the floor, however before…

View More Day 50: Measuring up

Day 49: A Day Off

Today was meant to be a day off, the plan was to pick up my mother, go to the chocolate fly-in for a couple of…

View More Day 49: A Day Off

Day 48: Rooflight

One of the problems with Saturdays is that half the day is lost to the weekly shop, and today was no exception, though we did…

View More Day 48: Rooflight

Day 47: Tidy up

Not much happening with the van tonight, just a quick tidy in preparation for tomorrows main event. Though I did fit the last ceiling backer.…

View More Day 47: Tidy up

Day 46: Firsts and Lasts

There is always a feeling of achievement about doing the last of something or the first of something. Doing the last of something means you can…

View More Day 46: Firsts and Lasts

Day 45: More of the Same

Tonight was very much a repeat of last night; four more ceiling supports were glued in (two more to go), as was another ceiling backer…

View More Day 45: More of the Same

Posts pagination

Page 1 Page 2 Page 3 Next page
Ursus Volans | Designed by: Guy Reynolds © Copyright All rights reserved
  • instagram
  • facebook
  • linkedin