I was up before the Lark today and in to work by 4:40am to carry out an ERP system upgrade, unusually the upgrade went with barely a hitch and so I was home by 10:30am. With most of the day at home I had time to catch up on bit and pieces.

The morning was spent assembling Bon-bon’s trampoline,whilst after lunch we moved the plywood from the van to the garage and gave the van a sweep out. Mid-afternoon the courier delivered the gas tank and fittings, so the next job will be to fit it, the only problem is how to get the mounting frame fitted across the width of the ribbed floor, particularly since there is a very deep trough down the centre of the floor.