Every time I finish off a major stage, I always seem to find myself a bit deflated and at a loose end. Today was no…
View More Day 144: Odds and sodsDay 143: Gas
With all the gas pipework done, Bon-bon and I made a quick run out to Royston to fill up with LPG. Unfortunately the pump was…
View More Day 143: GasDay 141: Gas manifold
This evening was spent constructing and installing the mounting for the gas manifold and the gas manifold itself. I has also planned to install the…
View More Day 141: Gas manifoldDay 140: Kitchen cabinets part 6
After writing the blog last night I went on to apply formica to the edges of the worktop. Then this moring I trimmed it back…
View More Day 140: Kitchen cabinets part 6Day 139: Kitchen cabinets part 5
I finished the basic cabinet today; the front was glued on and the openings and edges routed back flush with the rest of the structure.…
View More Day 139: Kitchen cabinets part 5Day 170: Early start and EHU
With my looming deadline, I started early this morning getting the second skin on the first half of the toilet door before breakfast. By the…
View More Day 170: Early start and EHUDay 138: Kitchen cabinets part 4
Assembly, with near enough everything cut including all the joints this evening was spent gluing and clamping the whole structure together. It is proving eaiser…
View More Day 138: Kitchen cabinets part 4Day 168: More toilet walls
Well the forecast rain never materialised, so I managed to get significant amount of wood cut ready for assembly during the week. Fitting timber in…
View More Day 168: More toilet wallsDay 136: Kitchen cabinets part 2
A second evening of working on the kitchen cabinets, having cut all the framing last night this evening was spent cutting and checking mortice joints.…
View More Day 136: Kitchen cabinets part 2Day 135: Kitchen cabinets part 1
I don’t know why but I am always surprised by the amount of timber the van keeps sucking up. Take this evening for example, I…
View More Day 135: Kitchen cabinets part 1