Skip to content
Ursus Volans

Ursus Volans

Ursus Volans
  • Home
  • Kiting
  • Photography
  • Blog
  • Contact
  • Instagram Feed
  • instagram
  • facebook
  • linkedin
  • instagram
  • facebook
  • linkedin

Month: March 2011

Ursus Volans > Blog > 2011 > March

Year 2 Day 24: More of the same

Yep, it was back in the van varnishing again to night getting the third coat on the cupboard and the front wall, hopefully I will…

View More Year 2 Day 24: More of the same

Year 2 Day 23: Varnishing

I think today’s title just about sums up this evening’s work, which was to put a second coat on everything I varnished a couple of…

View More Year 2 Day 23: Varnishing

Year 2 Day 22: Bits, pieces and sewing

The cupboard door catches arrived to day as did the plastic mouldings for the shoe locker, so I have no excuse for not cracking on…

View More Year 2 Day 22: Bits, pieces and sewing

Year 2 Day 21: Sanding, varnishing and cutting fabric.

The first job of the evening was to sand down where I filled the pin holes last night, after that is was on with the…

View More Year 2 Day 21: Sanding, varnishing and cutting fabric.

Year 2 Day 20: Edging, trimming and filling

Its amazing how big the living room appear to be now that the fridge has gone, but you don’t notice that its in the van.…

View More Year 2 Day 20: Edging, trimming and filling

Year 2 Day 19: Ikea

Well with the clocks going forward this morning we were all late getting up, and with the temperature outside still fairly cold we decided not…

View More Year 2 Day 19: Ikea

Year 2 Day 18: Fridge and another fascia

Much to Leng’s joy the fridge finally made it out of the living room and permanently into the van this morning. To my relief it…

View More Year 2 Day 18: Fridge and another fascia

Year 2 Day 16: Cupboard Fascia

Over the past couple of days I have been gluing battens to the rear of the cupboard fascia and the results can be seen in…

View More Year 2 Day 16: Cupboard Fascia

Year 2 Day 13: Vanity Panel

Having spent last night varnishing the panel at two hourly intervals it was already to install today, so this evening I pulled the van forward…

View More Year 2 Day 13: Vanity Panel

Year 2 Day 12: Black Mold

Having got the flooring done I made a start this morning on the vanity panel which closes off the area under the sink and hob which…

View More Year 2 Day 12: Black Mold

Posts pagination

Page 1 Page 2 Next page
Ursus Volans | Designed by: Guy Reynolds © Copyright All rights reserved
  • instagram
  • facebook
  • linkedin
 

Loading Comments...
 

You must be logged in to post a comment.