Thanks to lastnight’s preparation, clear skys, an early start and the speed of PU wood glue I was able to assemble the side wall of…
View More Day 157: Toilet cubicle againDay 156: Rain
Despite todays relentless rain I managed to get a fair bit done on the van today. The ladder frame was completed and all the wood…
View More Day 156: RainDay 155: Toilet cubical
After a week off during which we took the van to the Kiteflyers’s Jolly-up in Cliddesden and the Kiteflyer’s Picnic at Teston Bridge and did…
View More Day 155: Toilet cubicalDay 144: Odds and sods
Every time I finish off a major stage, I always seem to find myself a bit deflated and at a loose end. Today was no…
View More Day 144: Odds and sodsDay 143: Gas
With all the gas pipework done, Bon-bon and I made a quick run out to Royston to fill up with LPG. Unfortunately the pump was…
View More Day 143: GasDay 141: Gas manifold
This evening was spent constructing and installing the mounting for the gas manifold and the gas manifold itself. I has also planned to install the…
View More Day 141: Gas manifoldDay 140: Kitchen cabinets part 6
After writing the blog last night I went on to apply formica to the edges of the worktop. Then this moring I trimmed it back…
View More Day 140: Kitchen cabinets part 6Day 139: Kitchen cabinets part 5
I finished the basic cabinet today; the front was glued on and the openings and edges routed back flush with the rest of the structure.…
View More Day 139: Kitchen cabinets part 5Day 170: Early start and EHU
With my looming deadline, I started early this morning getting the second skin on the first half of the toilet door before breakfast. By the…
View More Day 170: Early start and EHUDay 138: Kitchen cabinets part 4
Assembly, with near enough everything cut including all the joints this evening was spent gluing and clamping the whole structure together. It is proving eaiser…
View More Day 138: Kitchen cabinets part 4