Skip to content
Ursus Volans

Ursus Volans

Ursus Volans
  • Home
  • Kiting
  • Photography
  • Blog
  • Contact
  • Instagram Feed
  • instagram
  • facebook
  • linkedin
  • instagram
  • facebook
  • linkedin

Month: May 2010

Ursus Volans > Blog > 2010 > May

Day 64: 202 Screws

This evening was spent screwing down the floor with 202 screws, thank goodness my power drill has a screwdriver mode, otherwise I would be nursing…

View More Day 64: 202 Screws

Day 63: Floor Stage III

The floor is now approaching completion,  surprisingly the polystyrene sheet did all but two of the sections in between the battens, and these I managed…

View More Day 63: Floor Stage III

Day 62: Floor Stage II Part 5 and Electrical Hook-up

Rather than get started on the floor straight away, the first job of the day was to fit socket and wiring for the mains hook-up.…

View More Day 62: Floor Stage II Part 5 and Electrical Hook-up

Day 61: Flooring Stage II Part 4

I all but completed the battening this evening, there is just a small area behind the driver’s seat that needs sorting but I can’t access it until the…

View More Day 61: Flooring Stage II Part 4

Day 60: Flooring Stage II Part 3

We reached a milestone today, we have had the van for 60 days, though I have only been working on it for the last 31…

View More Day 60: Flooring Stage II Part 3

Day 59: Floor Stage II Part 2

As with last night this evening was spent battening out the floor, and I am now over half way across the floor. As can be…

View More Day 59: Floor Stage II Part 2

Day 58: Floor Stage II

This evening was spent making a start on the battening on the floor. Again I am going against the grain because of the crushed ridging…

View More Day 58: Floor Stage II

Day 57: Floor Stage I and Gas Tank

A day of short sharp showers as a result I seemed to be moving tools and equipment undercover every 5 minutes, however I did manage…

View More Day 57: Floor Stage I and Gas Tank

Day 56: Ceiling, Tank Supports and Strengtheners and the Floor

There is one thing about doing a van conversion, it doesn’t matter if it is pouring with rain as one can work either in the…

View More Day 56: Ceiling, Tank Supports and Strengtheners and the Floor

Day 55: More thoughts on the tank

Having slept on it again, and considered both the gas and water tanks and the fact there are already distortions in the floor, I have decided…

View More Day 55: More thoughts on the tank

Posts pagination

Previous page Page 1 Page 2 Page 3
Ursus Volans | Designed by: Guy Reynolds © Copyright All rights reserved
  • instagram
  • facebook
  • linkedin